OWRP
Onsite Wastewater Registration Program
 
ASTTBC
OWRP ABOUT OWRP WHAT'S NEW PROGRAM INFO REGISTRATION Registrant List MARKETING LINKS CONTACT US Home
OWRP

Links to the current and/or previous updates posted on WHAT's NEW...
January 12, 2006
September 15, 2005
WHAT's NEW at OWRP...

Important information, bulletins and updates listed below were posted on... July 19, 2005

Important Updates for Onsite Wastewater Practitioners...

Who Files With The Health Authorities B001.05
All ROWPs should note that only the ROWP - Planner is the registered practitioner responsible for filing with the Health Authorities. Further, if the ROWP - Planner is not also the Installer, that the ROWP - Planner is responsible to do a construction review of the system installation to ensure that it was installed to the Planner's specifications and in the specified location. The ROWP - Installer would also be required to provide the ROWP - Planner (or professional) with a stamped and signed certification letter declaring that the sewerage system had been installed in the right location as specified.
This procedure was implemented to clarify the roles of the Planner and Installer with the HAs, and to simplify the filing process. The ROWP - Planner is also responsible for ensuring that the system's owner receives all the required documentation, along with a copy of the ROWP - Installer's certification document.
return to top

If you experience difficulties with this page, email the webmaster
ASTTBC © 2004-2005 | July 19, 2005