|
|
 |
| Who Files With The Health Authorities |
B001.05 |
|
|
| All ROWPs should note that only the ROWP - Planner is the registered practitioner responsible for filing with the Health Authorities. Further, if the ROWP - Planner is not also the Installer, that the ROWP - Planner is responsible to do a construction review of the system installation to ensure that it was installed to the Planner's specifications and in the specified location. The ROWP - Installer would also be required to provide the ROWP - Planner (or professional) with a stamped and signed certification letter declaring that the sewerage system had been installed in the right location as specified. |
|
| This procedure was implemented to clarify the roles of the Planner and Installer with the HAs, and to simplify the filing process. The ROWP - Planner is also responsible for ensuring that the system's owner receives all the required documentation, along with a copy of the ROWP - Installer's certification document. |
|
| return to top |
|
|
|
| If you experience difficulties with this page, email the webmaster |
|
| ASTTBC © 2004-2005 | July 19, 2005 |
|
|